Solutions from our factory in Mannheim: Renovation of a pumping station in Wermelskirchen
Industry
Aliaxis provided the solution as a complete package: The PE pipe, custom pre-fabrications from our factory in Mannheim and the mechanical connectors from the STRAUB brand.
December 6, 2024
Safe Transport of Radioactive Wastewater: Aliaxis' Tailored Solution with AkathermPlus Double Containment System
Industry
Aliaxis introduces an innovative solution to this challenge with the AkathermPlus double containment system. This system prioritises the assurance of safety and reliability.
October 20, 2024
Laying a d315 potable water pipeline for the development of a new industrial estate in Dormagen
Infrastructure
The development of a new industrial estate in Dormagen posed a particular challenge, as part of the old water supply pipes made of asbestos cement had to be replaced.
August 23, 2024
Newly laid PP pipeline with pneumatic butterfly valves and VKD ball valves for electrolyte distribution in Tyrol
Industry
Our customer was looking for a solution for distributing electrolytes in its copper electrolysis plant as part of a copper recycling process in Tyrol.
August 6, 2024
FRIASAFE for the Schwäbisch Hall brine baths
Infrastructure
The PE brine pipe of the brine bath in Schwäbisch Hall, which has been in operation since the 1990s, had a 5 cm long longitudinal crack due to soil settlement and surrounding sharp-edged rock.
June 21, 2024
Digitalization on the construction site at Stadtwerke Bad Nauheim
Infrastructure
With the help of the digital solution WorkFlow App and Web from Aliaxis Germany, the customer was able to digitally streamline its fusion processes, make them clearer, speed them up in real time and make work easier on the construction site by operating the FRIAMAT 7 prime fusion unit
March 26, 2024
From planning to commissioning - expansion of the wellness area in the family hotel
Industry
Aliaxis provides support in the careful planning of the individual areas for pools and children's attractions and coordinates the moving areas and their complex piping. Despite the tight schedule, the construction project was successfully completed on time.
March 26, 2024
New construction of the Misburg combined pool in Hanover with a total water surface area of 528 m²
Industry
The new combined outdoor and indoor swimming pool now has a sports pool with a diving pit, a training pool with a moving floor and a paddling pool area and a total water surface area of 528 m².
February 28, 2024
Neckarsteinach wastewater treatment plant - Aliaxis PE solutions in the wastewater area for sludge drainage in the sedimentation tank of the wastewater treatment plant
Infrastructure
The ageing and heavily corroded steel pipe for sludge drainage in the sedimentation tank of the Neckarsteinach wastewater treatment plant has been in operation since 1983. It was now dilapidated, there were repeated accidents and it was on the verge of failure.
February 21, 2024