Filter


Infrastructure
January 24, 2025

Infrastructure
January 2, 2025

Industry
Aliaxis provided the solution as a complete package: The PE pipe, custom pre-fabrications from our factory in Mannheim and the mechanical connectors from the STRAUB brand.
December 6, 2024

Industry
Aliaxis introduces an innovative solution to this challenge with the AkathermPlus double containment system. This system prioritises the assurance of safety and reliability.
October 20, 2024

Infrastructure
The development of a new industrial estate in Dormagen posed a particular challenge, as part of the old water supply pipes made of asbestos cement had to be replaced.
August 23, 2024

Industry
Our customer was looking for a solution for distributing electrolytes in its copper electrolysis plant as part of a copper recycling process in Tyrol.
August 6, 2024

Infrastructure
The PE brine pipe of the brine bath in Schwäbisch Hall, which has been in operation since the 1990s, had a 5 cm long longitudinal crack due to soil settlement and surrounding sharp-edged rock.
June 21, 2024

Infrastructure
With the help of the digital solution WorkFlow App and Web from Aliaxis Germany, the customer was able to digitally streamline its fusion processes, make them clearer, speed them up in real time and make work easier on the construction site by operating the FRIAMAT 7 prime fusion unit
March 26, 2024